Project Description

This Bridge we built out of Bluestone pitchers.

Creating a border around the two big concrete pipes then laying the pitchers in a stretcher bond.

We then used 100ml thick polished bluestone, for the capping.

Located at Austin Winery.

While constructing this bridge, one day about lunch time the rain started to fall very heavily, we stayed out of the rain for about 30mins. After about 30min of extremely heavy rain the rain started coming off the surrounding hills and all of a sudden within 15 minutes we were total flooded. The water had reached the top of those concrete pipes and our concrete mixer/wheel barrows were submerged. It took 3 days for the water to dissipate.

Project Details

  • Date April 26, 2017
  • Tags Rock Construction